Our Achievements

On September 15, a meeting was held with the temple committee. The temple committee requested them to arrange for the cleaning of the sewage lines around the temple for their puja. I took action immediately. As a result, the work of cleaning the temple's sewage lines is underway. Thank you to the City Corporation, they took action to clean the sewage lines even after informing them at night, Not only that, all the broken slabs around the temple are fixed....

Alhamdulillah, the installation of security gates at the entrance to the area through the alley next to KFC has been completed, In Sha Allah, security gates and security will be placed at every entrance to the area....

6 people have been deployed at 3 road junctions for the past 8 months to control traffic, who are engaged in traffic control on the roads during school hours....

On 2nd September 2025 after asking CI of City Corporation to fix the broken slab on the footpath opposite to Desh TV, after this evening CI called to say that the slab has been installed, thanks to CI..

If there is a little rain in monsoon, the entire area would be submerged in rain water, this year the drainage line of the entire area was cleaned so that the area does not get flooded during the rain...

There were many complaints about the Siddheshwari Boys School ground, games were played until 4 am, residents near the ground had trouble sleeping at night due to the shouting and screaming, someone had a sick patient at home, someone's child was undergoing a test, someone could not keep the windows of their house open due to drug use, after receiving so many complaints, I went to the ground and saw that the pocket gate on the eastern side of the ground had been removed, along with the tin, which made the ground unsafe. First, I turned off the lights of the ground, which stopped play after evening, Alhamdulillah, today 11.01.2026, the pocket gate and tin at the entrance were complete, at 11.30 pm, the gates on both sides of the ground were locked, everyone is being urged to follow the rules, otherwise strict legal action will be taken.....

From 24.01.2026, Saturday night, the gates on both sides of the 'Siddheshwari Boys School' ground were locked at exactly 11:30 pm. From that day on, the gates on both sides of the ground are being locked every day at 11:30 pm. We need your cooperation in this regard.

Due to the presence of electric poles at the entrance of Siddheshwari Khandaker Gali, it becomes difficult for two cars to pass, so measures have been taken to remove the poles, so that traffic jams can be reduced to some extent...

Scroll to Top